Lagoon and Earthen Manure Storage Basin Closure - Part 2
Leslie Johnson, Amy Schmidt, Charles Shapiro
Author
05/18/2018
Added
83
Plays
Description
Applying Nutrients to Cropland and Decommissioning the Structure
Searchable Transcript
Toggle between list and paragraph view.
- [00:00:00.471](upbeat music)
- [00:00:03.130]This video's the second in a two-part series
- [00:00:05.350]designed to illustrate the steps in planning
- [00:00:07.790]and conducting a successful closure of a lagoon
- [00:00:10.540]or earthen manure storage basin.
- [00:00:12.710]After watching this video,
- [00:00:14.450]viewer should understand recommended practices
- [00:00:17.530]for land applying liquid and sludge to cropland.
- [00:00:20.720]Methods for removing,
- [00:00:21.840]hauling, and applying sludge to cropland.
- [00:00:24.570]Steps to calibrate a manure spreader.
- [00:00:27.250]How to decommission conveyance pipes
- [00:00:29.080]and other components of the system.
- [00:00:31.640]And recommended land grading and ground cover establishment.
- [00:00:35.980]The goals during closure of a lagoon
- [00:00:37.710]or earthen manure storage should be to,
- [00:00:40.390]one, utilize stored nutrients such
- [00:00:42.680]that their agronomic value
- [00:00:43.970]is maximized while ensuring minimal risk to the environment.
- [00:00:48.370]And two, permanently eliminate the storage structure
- [00:00:51.240]or convert it to a pond.
- [00:00:53.530]There are two more common options for sludge
- [00:00:55.910]and effluent removal from a lagoon.
- [00:00:58.400]The first option is to dewater the lagoon
- [00:01:00.540]as much as possible through an irrigation
- [00:01:02.460]or a drag hose system, leaving all
- [00:01:04.270]of the settled sludge in the bottom of the storage.
- [00:01:07.420]This option requires access to irrigation
- [00:01:09.720]or a drag hose system,
- [00:01:10.990]and then handling of larger volumes of sludge.
- [00:01:14.090]The other way is to agitate the storage with the intention
- [00:01:16.700]of getting as much sludge into suspension as possible.
- [00:01:20.020]The agitated mixture of effluent
- [00:01:21.780]and sludge can then be pumped
- [00:01:23.160]and applied to cropland through a drag hose system
- [00:01:25.490]or tank style spreader.
- [00:01:27.480]Inevitably, there will still be sludge in the storage
- [00:01:30.130]once the mixture has been removed.
- [00:01:32.040]But the volume will be much less than dewatering
- [00:01:34.300]and handling the sludge separately.
- [00:01:36.780]Sludge removal for either option will require an excavator
- [00:01:39.850]or a large loader and a manure spreader
- [00:01:42.180]that can handle liquid or slurry manure.
- [00:01:44.790]Side slinger style spreaders are
- [00:01:46.430]likely to handle manure of this consistency the best.
- [00:01:50.900]Regardless of the method chosen for land application
- [00:01:53.410]of manure, make sure to apply it in an agronomic manner.
- [00:01:57.100]Calibration of any manure spreader,
- [00:01:59.030]whether they're an irrigation,
- [00:02:00.490]drag hose, tanker, or solid spreader,
- [00:02:03.290]is the only way to do this.
- [00:02:05.590]Knowing your application rate is critical,
- [00:02:08.310]so that overapplication of nutrients does not occur.
- [00:02:12.210]When applying liquid through an irrigation system,
- [00:02:14.870]the simplest method to verify application rate
- [00:02:17.310]is to place four to six rain gauges across the field
- [00:02:20.100]and measure how much effluent is being applied.
- [00:02:23.350]When using a drag hose system,
- [00:02:25.140]application rate can be determined using the flow rate,
- [00:02:27.930]speed of the tractor, and width of the toolbar.
- [00:02:31.140]If a tank style spreader is used,
- [00:02:33.220]calculate application rate by taking the volume of manure
- [00:02:36.460]and dividing it by the application area.
- [00:02:40.140]When hauling sludge, there are a few ways
- [00:02:42.210]to calibrate your spreader,
- [00:02:43.890]but one of the simplest ways
- [00:02:45.280]is to spread out several 22 square foot plastic
- [00:02:48.100]sheets across the area you plan to apply using rocks
- [00:02:51.700]or flags to hold the sheet in place.
- [00:02:54.140]Spread as usual, and collect each sheet individually.
- [00:02:57.880]Weigh in each sheet individually in the bucket,
- [00:03:00.400]subtract the weight of the bucket containing a clean plastic
- [00:03:03.100]sheet from the weight of the bucket with the manured sheet.
- [00:03:06.410]Because the sheet is 22 square feet,
- [00:03:08.940]the application rate in tons per acre is equal to the weight
- [00:03:12.210]of manure on the sheet.
- [00:03:14.460]For all types of manures and spreaders,
- [00:03:16.590]adjust your application rate based
- [00:03:18.380]on the manure analysis and the nutrients you want to apply.
- [00:03:23.280]In order to prevent manure additions to the storage,
- [00:03:26.110]conveyance pipes or other conduits
- [00:03:27.910]to the storage must be removed
- [00:03:30.180]or otherwise prevented from allowing manure
- [00:03:32.400]to flow to that storage.
- [00:03:34.680]If complete removal is chosen,
- [00:03:36.780]trenches where the pipes were should be filled
- [00:03:38.890]and packed with soil.
- [00:03:40.510]If pipes are left in place,
- [00:03:42.190]the inlet pipe can be broken off
- [00:03:43.950]and all access points permanently plugged.
- [00:03:46.950]To minimize cost at our lagoon,
- [00:03:49.160]pipes at Haskell Ag Lab
- [00:03:50.570]were left in place with the inlet
- [00:03:52.260]broken off about five feet back
- [00:03:54.040]from the original berm.
- [00:03:55.890]Access points in each building were plugged with concrete.
- [00:03:59.490]To minimize waste, mix cement thick enough
- [00:04:02.330]that it stays near the access point.
- [00:04:05.090]Due to the size and slope of some pipes,
- [00:04:07.360]using wadded paper or some other material
- [00:04:09.560]to prevent movement of
- [00:04:10.510]the concrete before curing may be necessary.
- [00:04:14.750]Once the storage has been emptied,
- [00:04:16.330]it's a good idea to contact your state regulatory agency
- [00:04:19.390]to determine if land grading
- [00:04:20.980]and deconstruction of the berm can progress.
- [00:04:23.890]Some states may require
- [00:04:25.170]that the regulatory agency be given an opportunity
- [00:04:27.950]to inspect the structure once it is emptied.
- [00:04:31.140]For structures that were built with a compacted clay liner,
- [00:04:34.070]two options exist for managing the liner material.
- [00:04:37.210]It can be excavated and tilled in with the surrounding soil
- [00:04:40.550]or left intact and covered with soil.
- [00:04:43.200]If left largely intact,
- [00:04:44.800]holes or trenches should be created through the liner
- [00:04:47.340]to allow stormwater to drain from the area effectively.
- [00:04:50.940]A liner left intact below the soil surface may lead
- [00:04:53.930]to frequent ponding or permanently wet
- [00:04:55.930]soil at the location.
- [00:04:58.070]The berms of the structure can now be deconstructed
- [00:05:00.750]and clay liner material within the lower section
- [00:05:03.100]of the berms may be incorporated into surrounding soil.
- [00:05:06.890]During the final stages of the land grading process,
- [00:05:10.020]ensure that the area is mounded slightly
- [00:05:12.160]to facilitate drainage
- [00:05:13.600]and accommodate settling of the soil over time.
- [00:05:17.860]Establishing and maintaining permanent vegetation cover
- [00:05:21.030]is an important final step in the closure process.
- [00:05:24.030]As the bare soil in the area
- [00:05:25.630]where the storage structure used
- [00:05:27.240]to be is subject to erosion until
- [00:05:29.530]the ground cover is established.
- [00:05:31.700]A plan for establishing vegetation
- [00:05:33.660]on site should be developed prior to completing the closure
- [00:05:36.950]of the structure, to minimize the amount
- [00:05:39.030]of time the disturbed soil is left bare.
- [00:05:42.010]The NRCS offers a conservation practice
- [00:05:44.610]standard code 327, describing criteria
- [00:05:48.010]for establishing conservation cover depending
- [00:05:50.690]on the intended use of the land area.
- [00:05:53.440]At a minimum, it is important to select plant species
- [00:05:56.590]that are best suited to the soil,
- [00:05:58.800]climate, and site conditions,
- [00:06:00.900]and to adequately prepare the site prior
- [00:06:03.660]to seeding at a rate that will accomplish the desired cover.
- [00:06:08.980]Conservation cover vegetation scenarios
- [00:06:11.360]include introduced grass,
- [00:06:14.210]native grass, pollinator species, and monarch species mixes.
- [00:06:20.260]The pollinator and monarch species mix are a combination
- [00:06:23.910]of native grasses, legumes, and forbs.
- [00:06:27.950]All mixtures are used to reduce soil erosion,
- [00:06:31.270]reduce soil quantity degradation,
- [00:06:34.020]improve water quality,
- [00:06:35.730]develop wildlife habitat, and improve air quality.
- [00:06:39.390]Payment rates vary from 79
- [00:06:41.740]to $129 per acre for the introduced and native grasses.
- [00:06:46.340]Pollinator species and monarch species mix
- [00:06:49.680]are higher payment rates, starting at $400 per acre.
- [00:06:53.640]For current rates, contact your local NRCS office.
- [00:06:58.224](upbeat music)
- [00:07:00.480]As we've shown in this two-part video series,
- [00:07:02.630]the process of planning
- [00:07:03.990]and conducting a lagoon or earthen manure storage
- [00:07:06.520]basin closure requires careful planning
- [00:07:08.940]and management of the storage contents
- [00:07:11.090]to ensure economic use of manure nutrients
- [00:07:13.710]and mitigation of environmental risk during pumping
- [00:07:16.340]and application activities.
- [00:07:18.410]Aged lagoons and manure storage structures or any structures
- [00:07:22.130]that are no longer being operated should be emptied
- [00:07:24.610]and decommissioned if operators do not intend
- [00:07:26.910]to continue managing the structure as a manure storage.
- [00:07:30.900]State regulatory agencies,
- [00:07:32.420]university extension,
- [00:07:33.720]and the NRCS can all provide guidance during the process
- [00:07:36.850]of planning and conducting a lagoon
- [00:07:38.810]or manure storage structure closure.
- [00:07:41.740]Manure storage owners are encouraged
- [00:07:43.670]to contact their state NRCS office
- [00:07:45.790]to inquire about cost share opportunities for closure
- [00:07:48.730]of their manure storage.
- [00:07:50.920](upbeat music)
The screen size you are trying to search captions on is too small!
You can always jump over to MediaHub and check it out there.
Log in to post comments
Embed
Copy the following code into your page
HTML
<div style="padding-top: 56.25%; overflow: hidden; position:relative; -webkit-box-flex: 1; flex-grow: 1;"> <iframe style="bottom: 0; left: 0; position: absolute; right: 0; top: 0; border: 0; height: 100%; width: 100%;" src="https://mediahub.unl.edu/media/9492?format=iframe&autoplay=0" title="Video Player: Lagoon and Earthen Manure Storage Basin Closure - Part 2" allowfullscreen ></iframe> </div>